Upstairs Hall Bathroom During

E-mail Adam

Updated Site Updated: 12/20/04

Before During (you are here) After

Upstairs Hall Bathroom During Photos

Using the sludge hammer was fun. There was a ton of deprise I had to throw out.
Glass block installed in the tub.
Completely new electrical going in. I lot of new switches.
I had to run slightly re-route some plumbing lines.
Tub removed. that was hard as hell.
Some of the sub-floor needed replacing.
The new tub is under the plywood (used for protection) and the installation is there to keep things warm.
Durarock on the floor ready for tile installation.